Team Ontario/BC decathletes and faculty leads are spending almost every day now at MCM’s shop, where they are working quickly on multiple fronts to fabricate the components for the North House. The wall and roof panels have been foamed with environmentally responsible soya based foam insulation, donated by Demilec. Jack and Brad review the corner detail of the panels.

Foaming of the floor and roof panels (left); Corner detail (right)
Outside, the floor of the densepack has been framed and also foamed. In the foreground is the integrated shower drainage pan. The steel chassis is supporting the whole assembly and this will tie in to the deck panel modules.

Densepack floor framing (left); Steel chassis with decking connections (right)
In another part of the shop, the exterior deck steel components are complete and await assembly into easily handled panel modules. The stainless drainage pans for the entry and the shower have just been break-formed and will be placed in the densepack the next day.

Exterior deck components (left); Freshly breakformed stainless steel drainage pans(right)
Jack and his crew are also moving along with the wood curtainwall. The Douglas Fir mullions with Poplar cores have been milled, glued and clamped.

Wood curtainwall mullions